Before discussing the issue of work requiring SRO approval, let's take a closer look at this topic. After all, the more the owner of a construction organization knows about all the working conditions, the easier it will be for him to provide his services to customers. To begin with, we will find out what this short abbreviation means and who should receive admission to the work of the SRO. Useful information is never superfluous.

What is an SRO?

These three letters are an acronym that stands for Self-Regulatory Organization. In our case, this is an association of builders and designers, or more precisely, enterprises and companies that perform these functions. The main task of this organization is to control the observance of the quality and professionalism of the services provided in the field of construction.

permit to work
permit to work

All entrepreneurs, joining the SRO, are required to pay a certain amount. The funds received in this way go to the compensation fund, from which, if necessary, the costs of compensating for damage caused by poor performance of work by any of the members of the SRO are paid. I.ethe organization is a kind of guarantor of the quality of the services provided, which, of course, inspires confidence in its members on the part of customers. That is why, before starting cooperation with a particular company, customers of construction projects are interested in whether the company has SRO permits for construction work.

Why do I need to get a clearance?

Currently, membership in the SRO is a replacement for a license for the right to conduct construction work and performs the same function. Only organizations that have proven their professionalism and experience can become full members of a self-regulatory organization. It should be noted that the selection is quite strict - this allows you to weed out unscrupulous entrepreneurs at an early stage and protect consumers from poor-quality work. So, membership in the SRO is a proof of the competence of an organization.

permits for construction work
permits for construction work

The construction of new facilities, as well as the overhaul of existing ones, should be carried out only by masters of their craft, otherwise it may lead to situations dangerous to human life and he alth. Therefore, the specialists compiled a list that includes the types of work for which SRO approval is mandatory. We will move on to it later.

Who should get clearance?

As noted above, any enterprise providing services for the construction, repair and reconstruction of buildings and other facilities should become a member of a self-regulatory organization. This condition is mandatory for those who wantprovide the listed services within the framework of existing legislation. Moreover, admission to the work of the SRO should be obtained taking into account what services will be performed. For example, a company that has received a permit to carry out land or facade work does not have the right to carry out project activities. This requires special permission.

Works requiring SRO approval

The list below includes work, the implementation of which requires a mandatory permit from a self-regulatory organization, regardless of the conditions under which they will be performed.

  1. Installation of rail tracks and supports for construction cranes.
  2. Soil development (except mechanized), its artificial freezing, dewatering and surface drainage.
  3. Well construction, grouting and the creation of shaft wells also cannot be performed if the organization has not received permission to work with the SRO.
  4. Device of piles, grillage, soil strengthening.
  5. Installation of prefabricated and erection of monolithic reinforced concrete structures.
  6. admission sro list of works
    admission sro list of works
  7. Drilling and blasting.
  8. Creating metal structures.
  9. Works to protect building structures.
  10. Installation and dismantling of gas supply systems, laying and testing of water pipelines.
  11. Establishment of external networks of gas supply, heat supply, sewerage and power supply.

List of other services that require access towork SRO

  1. Creation of gas and oil industry facilities.
  2. Various installation work.
  3. Commissioning.
  4. Construction of airfields and highways.
  5. Device w. and tram tracks.
  6. Construction of subways and tunnels.
  7. Creation of mine facilities.
  8. Establishment of overpasses, bridges and flyovers.
  9. Hydraulic and diving works.
  10. Building industrial furnaces and chimneys.
  11. Construction control.
  12. Organization of construction, overhaul or reconstruction.

When you don't need a permit

This list includes works for which a permit is required only if they are performed at technically hazardous and other complex facilities, a list of which can be found in the Town Planning Code of the Russian Federation (Article 48.1).

work for which a permit is required
work for which a permit is required
  1. Geodetic works.
  2. Preparatory work other than those in the first list.
  3. Mechanized excavation and compaction with rollers.
  4. The device of stone and wooden structures, as well as roofs.
  5. Coating building elements with paints and varnishes for protective purposes.
  6. Arrangement of internal engineering systems, thermal insulation of pipelines.
  7. Facade work.
  8. Electrical network device with voltage up to 1 kW.
  9. Creation of facilities for the use of atomic energy.
  10. Installation of automation and alarm systems, compressors and pumps,equipment for the food, agricultural, electronic and medical industries.
  11. Some types of commissioning:
  • automation in power supply;
  • autonomous and complex system adjustment;
  • means of telemechanics;
  • ventilation and air conditioning systems, as well as refrigeration units;
  • hot water heating boilers.

SRO approval for design work

When erecting new buildings or during the reconstruction and overhaul of old ones, a great responsibility lies with the engineers, according to whose calculations all subsequent work is carried out. A small mistake in the drawings can cost the lives of many people.

types of work
types of work

Therefore, there is a list of design services, for the implementation of which it is also necessary to obtain permission from the SRO. The list of works is given below.

  1. Preparation of planning solutions for the organization of the construction site.
  2. Creation of architectural, constructive and technological solutions.
  3. Preparation of data on external and internal engineering networks and equipment.
  4. Development of special sections of the project, as well as those responsible for fire safety, environmental protection and providing access for people with limited mobility.
  5. Construction organization design.
  6. Inspection of building structures.
  7. Organization of preparation of project documentation.

It is very important to read all the lists in a timely manner and get everything in timethe necessary SRO permits for construction work and design, so as not to subsequently violate one of the laws of the Russian Federation. After all, as you know, ignorance is no excuse.