The question is "how to fill the foundation?" is very important, since in the process of erecting any buildings there are no moments that can be called insignificant, because each of them depends on how good the foundation of the object and its subsequent fate will be. Filling the formwork with concrete mix is one of the key stages of construction. You can proceed to this stage if all earthworks are completed, and the formwork and waterproofing are installed, in addition, the reinforced frame should be ready.
If we talk about how to properly fill the foundation, then there are several ways to consider. The choice of a particular one is dictated by the difference in the cost of money and time. The most economical, but at the same time time-consuming, is pouring the foundation yourself, when the preparation of concrete is carried out directly on the site using a compact concrete mixer. Suchequipment can be of different volumes, from 50 liters or more. The number of cycles will depend on the performance of this equipment. Speaking about how to properly pour the foundation, it is worth saying that it will be very difficult to do all this work with one pair of hands, especially when it comes to the large dimensions of the future structure. Typically, the concrete mixer is located in the immediate vicinity of the pouring site. It is desirable that there are no more than two layers in the foundation, if this is not possible, then it would be more correct to fill it in parts to the height of the formwork. Each layer of concrete must be compacted so that it does not form cavities. For this procedure, you can use improvised means, or rent a deep vibrator that can significantly reduce the amount of work.
Speaking about how to properly pour the foundation, it should be noted that after laying the last layer, it is necessary to cover the entire structure with a protective layer of roofing material or film.
Let's consider another way. You can call a concrete mixer truck. This option is more expensive than self-filling, but in one approach it allows you to fill the foundation for the whole house, while the quality of work will be as high as possible. One truck mixer is capable of delivering 4-8 cubes, and if necessary, you can order several machines, it all depends on the need for concrete. The preparation process in this case comes down to making special gutters. They allow you to pour the mixture intothe most secluded places of formwork.
Speaking of how to properly pour the strip foundation, it is worth noting that, using a concrete mixer, the mortar should be distributed over several points of the formwork. This is the only way to obtain a uniform distribution of the mixture according to the required volume. If you pour at one point, then it will take a lot of effort to distribute it throughout the formwork.
You can use a concrete pump. This option is relevant only if it is not possible to drive up to the construction site, and the use of a gutter, the length of which will be several tens of meters, is irrelevant. In this case, you should be prepared for significant financial costs.
Now you have an idea of how to properly pour the foundation of the house.