9 by 9 house project: features of the location and construction of the building

Table of contents:

9 by 9 house project: features of the location and construction of the building
9 by 9 house project: features of the location and construction of the building

Video: 9 by 9 house project: features of the location and construction of the building

Video: 9 by 9 house project: features of the location and construction of the building
Video: 12 Steps of Construction 2024, April
Anonim

Before you start building your own housing, you should decide on the plot of land on which it will be located. After that, you should draw up a project for a two-story house 9 9, which will take into account the type of soil on the site.

house project 9 by 9
house project 9 by 9

Location features

The project must specify the type of waterproofing and foundation of the new structure. After all, it is the geodesy of the earth that has a very important role in this factor, regardless of the main material used in construction. You should also pay special attention to the location of communication systems. After all, for example, conducting gas or water communications at the present time is too costly. You should also clarify in advance the location of hospitals, kindergartens, schools and shops. It is desirable that they are close. The climate zone of your home also affects:

- type of facade decoration;

- type of insulation and its thickness;

- timber type;

- beam section.

Projects

After determining the site, you should decide on the type of structure. The customer can choose the appropriatean option from existing ones or order an individual project of a 9 by 9 house. At the moment, thanks to a different section, housing from a bar can be made in this style:

- Modern.

- Medieval.

- Colonial.

- Swiss Chalet Style.

two-storey house project 9 9
two-storey house project 9 9

The most popular at the moment is the project of a 9 by 9 house. Such a dwelling is quite simple to build. Due to its square shape, the house is perfectly placed on a plot of about 1 acres.

Ready-made standard projects of houses 9 by 9 meters allow you to save money. They can be adjusted by specialists at the request of the customer. You can place differently window and door openings, interior walls.

More expensive is the project of a 9 by 9 house made of glued laminated timber. The cost of such a structure, compared with other structures, will be approximately the same, because its insulation implies a minimum of costs.

Construction requires a professional approach, so it is not recommended to carry out work on your own. You should choose the right contractor, on which the cost and comfort of the future home, as well as the speed of its construction, will depend. Remember: before signing a contract with a contractor, you should definitely carefully study all the reviews about him. You should also look at the structures already built by this contractor.

Foundation of the structure

The foundation of the structure can be built independently. It is known that houses made of timber are lightweight. Most often, for the manufacture of a foundation for a two-story house, they use:

- Tape.

- Pillar.

- Mixed.

The pillar foundation can be used to build a house from glued laminated timber or timber with a minimum cross section of 150 mm without additional insulation and facade finishing. The cost of building such a foundation is about 70 thousand rubles, excluding labor.

projects of houses 9 by 9 meters
projects of houses 9 by 9 meters

Many experts recommend using a strip or mixed type of foundation, taking into account wind loads and the stability of the structure. Such a foundation should definitely be chosen for building a house from a bar of more than 150 mm. In any case, the design of a 9 by 9 house should also include a description of the type of foundation required.

Roof

The final stage of the construction of the structure is the erection of the roof. For a house from a bar of natural moisture, a rough roof is first installed. Only after the object has settled down, it is possible to lay a final roof.

The duration of laying the roof directly depends on the complexity of the design and the selected material. If the contractor was involved in the construction of the building, then the final stage is the acceptance of the house according to the acceptance certificate. This should be taken seriously, because the quality of the work performed depends on the comfort and coziness in your private home.

Recommended: