Connecting a house to gas: rules, procedures and requirements, necessary documents

Table of contents:

Connecting a house to gas: rules, procedures and requirements, necessary documents
Connecting a house to gas: rules, procedures and requirements, necessary documents

Video: Connecting a house to gas: rules, procedures and requirements, necessary documents

Video: Connecting a house to gas: rules, procedures and requirements, necessary documents
Video: LPG GAS CONNECTION - नए गैस कनेक्शन के लिए कौन कौन से Documents की जरूरत होती है !! 2024, December
Anonim

Gasification of the residential sector outside the city removes a lot of household problems from the owners. Using blue fuel, you can completely solve the problems of heating and cooking. Another thing is that the process of connecting a house to gas is quite complex and multi-stage.

New gasification rules - what to consider?

In two years (2017-2018), several changes were made to the Russian legislation regulating the gas connection procedure. In general, they focused on simplifying access to gas supply networks, including by reducing the time for consideration of applications. Citizens also got the opportunity to apply for connection to backbone networks via the Internet.

The connection time has been halved. In addition, the new rules for connecting gas to the house reduce the time for issuing project documentation from 20 to 15 days (working). Approval of payment for an individual technical connection project takes 22 working days. The maximum connection period inin cases where only the actual introduction into the gas supply network is envisaged - from 12 to 3 months.

Also, in accordance with the updated rules for connecting the house to gas, service organizations must provide customers with information about the work at all stages of the project. In particular, they must report supply line throughput rates that may affect the stability of the fuel supply.

Connecting the house to gas
Connecting the house to gas

What documents are required?

The whole procedure begins with the collection of documentation that will allow you to prepare an initial certificate of technical conditions (TS) for connection. At this stage, you can apply to the so-called "Single Window" or multifunctional center. At the stage of applying for technical specifications, the following documents will be required to connect gas to a private house:

  • Situational plan of the site to which it is planned to carry out gas supply.
  • Copies of the passport and documents for the site and the house (in case the construction work is completed).
  • Power of attorney or other documentation, if the application is submitted by a representative of the owner of the connection object.
  • If the planned gas consumption exceeds 5 m3/hour, then an approximate calculation of the volume of fuel consumption will be required.
  • Consent of the owner of the gas pipeline network with which the object is planned to be connected.

Also, in some cases, the list of documents for connecting a house to gas provides for a survey of the site if the first gasification is performed. Graphics Documentmust be made no earlier than 2 years prior to the submission of the request.

Then follows the conclusion of an agreement on the connection of the target object with the gas pipeline. It can be drawn up not only with the direct organization - the owner of the supply line. For example, it may be a third-party service company involved in the maintenance of the gas distribution network. After that, a contract is concluded for the development of the project and the execution of installation work. This document also does not have to be concluded with the direct owner of the highway. However, under the contract, both the owner of the house with the plot and the person servicing the network must create the necessary conditions for the implementation of the connection.

Conditions for connecting the house to gas

Technical conditions are important as a document that, in principle, confirms the very possibility of a technological connection between a house and a gas supply line. Moreover, the conditions may differ in relation to different groups of consumers. As already mentioned, the boundary point is the level of consumption of about 5 m3/hour. Owners who expect to meet this indicator belong to the initial group of private consumers. This is followed by categories with fuel consumption above 5, 15 and 300 m3/hour, which includes representatives of small businesses, medium and large industrial organizations.

Gas connection circuit
Gas connection circuit

Why is belonging to a particular category important at the stage of approval of specifications? The fact is that the second and subsequent categories of consumers set the commercial objectives of the operation of communications, forwhich are automatically tightened and requirements. In particular, more stringent land management procedures, technical and structural parameters of the network infrastructure, etc. are envisaged.

And vice versa, gas is connected to a new house on the basis of a document with technical conditions confirmed by the resource supplier. The verification procedure in this case is simplified as much as possible, since we are talking about communications with a minimum load. In most cases, possible inconsistencies are eliminated by technical means at the initial stage of project development. One way or another, by the time the design solution is created, the following data should be indicated:

  • Location of connection point.
  • Location of the gas intake point.
  • Fuel supplier line specifications.
  • Configuration and material of the pipeline.
  • Technical parameters in the tie-in area.
  • Diameter of the pipe for connection.
  • Gas pressure in the central system.
  • Climatic conditions.

Preparing a design decision

The project is created by licensed organizations that can also offer installation services. A complex order of works, as a rule, is cheaper. In the overall structure of the arrangements for the design and connection of the gas supply line, the development of the project is of key importance, determining how exactly the connection of the house with the gas source will be technically carried out.

This document contains explanatory notes with drawings including the following information:

  • Configurationplacement of gas equipment and other units of direct fuel consumption.
  • Schemes for tracing lines of gas pipelines on the street and indoors.
  • Ventilation and smoke duct placement parameters.
  • Clarifications and details that are individual in relation to a particular situation.

Usually, a project for connecting a house to gas is drawn up in 2-3 weeks. If there is confidence in the successful preparation of technical specifications, then in order to save time, it can be ordered at the stage of application. Experts recommend that future owners of a gas point of consumption provide the design engineer with as much information as possible about the conditions and nature of the planned operation of the line. This will allow him to prepare a more informative and accurate document detailing planning decisions.

Installation events

Laying a gas network for the house
Laying a gas network for the house

When the project is ready, the customer must check it and approve it for implementation. On the basis of the prepared solution, installers collect cost estimates for construction, repair and commissioning activities. When the execution of these documents is completed, a team of workers is sent to the facility to perform the necessary operations for connection. It is important to note that installers do not tie in and supply fuel. Their responsibilities include laying the contour, after which acceptance and tie-in are made. According to the rules for connecting gas to a private house, after installation work, an inspector leaves for the facility. It draws up an act of acceptance, on which it will dependthe further course of the enterprise. Or additional repair operations are carried out with adjustment of the performed installation, or a contract for the supply of gas is signed. Then, after a while, a tie-in is performed and the gas supply begins.

Cost of connection to the gas distribution network

Specific prices are determined by many factors, including the volume of gas consumption, the distance of the object from the point of intake, the area of the house, etc. Under the most favorable conditions, you can count on the amount of 10-15 thousand rubles. Discounts are given to beneficiaries of different categories. What is included in the minimum work package? At a minimum, a supply line will be provided with a connection to the site from the main network. But if the distance from communications is more than 200 m, then the cost can increase significantly. For example, a complex connection of a house to gas in the Moscow region can cost 300-500 thousand. Prices increase if the customer also plans to carry out multi-level network wiring in a large private cottage. On the other hand, turnkey works will cost less than a phased solution of individual tasks separately.

Advice on choosing gas equipment

Connecting gas equipment
Connecting gas equipment

The safety of the line operation, its efficiency and productivity will depend on the technical means of gas consumption. Therefore, when choosing gas equipment, several significant points should be taken into account:

  • The unit must be certified and have a technical passport.
  • Reliable connection of equipment with a craneprovided with a special rubber-fabric hose, which either comes with the equipment, or is purchased separately. But it is important to consider that the rules for connecting gas to a private house prohibit the use of rubber hoses in a metal braid.
  • In addition to the requirements for safety and basic consumer qualities, you should not ignore the ergonomic properties of a particular model. This applies to controls, remote control, interface characteristics, design of thermostats and sensors.
  • Possibility is provided for piping with adjacent heating, pumping, distribution or water supply equipment.
  • It is advisable to give preference to large manufacturers of engineering equipment, including Baxi, Ariston, Ferroli, VIESSMANN and AEG.
  • Installation, adjustment and replacement of equipment is carried out only by a specialized organization that has an agreement on the maintenance of in-house gas equipment. Owners of private houses conclude such an agreement on an individual basis.

Features of connecting an apartment building to gas

gas wiring
gas wiring

Legally, the transfer of apartment buildings to the gas supply system is implemented at the municipal level, taking into account safety standards and requirements for comfortable living of citizens. From a technical point of view, the difficulty may lie in replacing communications designed to provide liquefied fuel with systems designed to connect to natural gas sources.

If at the time of project developmentIn apartments for hot water supply, titanium and gas water heaters are already used, then technically the problem is solved by a simple reconstruction of gas supply, but also at the expense of the users themselves. In any case, the procedure for connecting gas to the house involves a meeting of an initiative group of owners with the participation of representatives of the managing organization. Residents instruct the management service to carry out specific activities related to the transfer of communications to the possibility of supplying natural gas.

Autonomous gas supply as an alternative

Connection to an autonomous gas source
Connection to an autonomous gas source

The solution is suitable for private homeowners who, for one reason or another, do not plan to connect to the central gas supply network. This solution justifies itself in case of unsatisfactory performance of the available gas pipeline or in the absence of the possibility of connecting to it at all - as a rule, due to the large distance.

The solution is an autonomous gas supply, which is usually implemented using a gas tank. This is a special large-volume tank (3-10 thousand liters), which acts as a source of fuel. To connect the house to gas through this tank, a special project is also required, after which technical operations are carried out, but in a much smaller volume. In general, in terms of cost, such a project will also be expensive - mainly due to the price of a gas tank, which can be several hundred thousand rubles. In addition, periodic filling of the tank with fuel will be required. The gas holder itself is installed on the site inspecial pit. At this stage, installation activities require serious labor costs, but they can not be dispensed with.

Conclusion

Organization of gas supply within the framework of one's own household is one of the key conditions for its full-fledged household operation. The current procedure for connecting gas to a private house, although simplified in relation to previous procedures, also provides for the implementation of a number of troublesome measures. At the basic level, it is necessary to prepare the necessary documents that will allow you to start the process of solving the problem. This will be followed by a set of organizational and technical measures, the quality of which will also determine the success of the entire event.

Home gas control unit
Home gas control unit

For many owners of country cottages, the problematic point of gasification is still the financial side of the issue, since laying networks in remote villages is quite expensive. The situation is complicated by the fact that at the first stages it is not always possible to calculate the full estimate of the project. Therefore, it is extremely important to take this aspect into account even before the start of organizational procedures.

Recommended: