How long does a self-leveling floor dry for laminate, tile, linoleum: pouring technology, drying time, manufacturers overview, reviews

Table of contents:

How long does a self-leveling floor dry for laminate, tile, linoleum: pouring technology, drying time, manufacturers overview, reviews
How long does a self-leveling floor dry for laminate, tile, linoleum: pouring technology, drying time, manufacturers overview, reviews

Video: How long does a self-leveling floor dry for laminate, tile, linoleum: pouring technology, drying time, manufacturers overview, reviews

Video: How long does a self-leveling floor dry for laminate, tile, linoleum: pouring technology, drying time, manufacturers overview, reviews
Video: Self Leveling Floor Tips for Beginners 2024, April
Anonim

Before you start repair work, you need to draw up a schedule. It usually starts with the floors. Therefore, you need to calculate the time, how much it will take for this part of the room. If you prefer self-leveling compounds, then there are some factors to consider. Among others, one should single out those that affect the drying of materials. Among others:

  • number and final thickness of layers;
  • type of finish coat;
  • kind of dry composition;
  • additives used;
  • humidity and room temperature.

Which topcoat to use

As for the finish coating, it can be:

  • linoleum;
  • laminate;
  • tile.

To speed up the polymerization of self-leveling floors and their further operation, some rules should be taken into account. First, the composition must be evenly distributed over the surface. The material is calledself-levelling, but he should be helped. In order for the level of the solution to be the same, you should use a long and short spatula.

Things to consider

A spiked roller should be used to remove air bubbles from the mixture. Secondly, the optimum temperature in the room should be between 22 and 25 ˚С. In this case, jumps are unacceptable, otherwise the freezing will be delayed for more than 2 weeks.

Conditions for normal floor drying

how long does it take for laminate flooring to dry
how long does it take for laminate flooring to dry

If you are wondering how long a self-leveling floor dries under a laminate, then you can find this information below in the article. However, in order to be sure that it will take exactly the time indicated in the instructions to dry, simple rules should be followed. For example, indoor humidity levels should be between 60 and 65%.

How to avoid mistakes

In addition, the surface should be protected from ultraviolet radiation. 1 hour after completion of work, cover the floor with a dense film. After 6 hours, varnish can be applied to the floor. After 12 hours or more, foot traffic is allowed. When a week has passed, the base can be subjected to a high load. If you follow these requirements, the floor will dry in accordance with the timing.

Drying time

how long should the self-leveling floor dry
how long should the self-leveling floor dry

If you, like many home craftsmen, are interested in the question of how much the self-leveling floor dries under the laminate, then you should deal with the base of the coating. It will depend on thispolymerization time. For example, quick-drying mortars have good technical properties and short drying times. This usually takes 2 to 5 hours. But as for cement-based coatings, they are usually used in private construction. They contain additives, plasticizers and cement. Such a floor can harden from 1 to 2 weeks.

You may also be interested in how long the self-leveling floor under the laminate dries. If the material is polymeric, then it is usually used in industrial construction. Drying time in this case is from 2 to 6 days. The final value is influenced by the number of layers and their thickness, as well as the presence of additives and special pigments. You can also use polyurethane. It is durable and strong. On such a floor it will be possible for a person to move in 10 hours at least. Full solidification should be expected on the third day.

If, after visiting a building materials store, you wondered how long a self-leveling floor dries under a laminate, you should know that gypsum mixtures, which are also called anhydrite, are not recommended for use in rooms with high humidity. This should include toilets and bathrooms. This is due to the fact that such material does not have the quality of moisture resistance. It will be possible to walk on the plaster floor in two days, and to install furniture - in 10 days.

If you want to choose a floor with high wear resistance, epoxy should be preferred. Curing time will depend on the number of coats and final coating thickness. On average forpolymerization takes from 2 to 5 days. Quite often, buyers in a store are wondering how long a self-leveling floor should dry. If you have a 3D effect coating in front of you, then the curing time will depend on the parameters of the image.

how long does the self-leveling floor miners dry
how long does the self-leveling floor miners dry

If film or vinyl paper is used for decoration, then the top coat can be applied immediately. When the design is applied with paint, the drying time may be longer. Of great importance is the drying time of the glossy layer and the hardening period of the top coat. The drying time of the 3-D floor is about 7 days. You can shorten the period by using a quick-drying compound.

Dependence of drying time on the finish coat

Self-leveling floors are designed for laying under laminate, linoleum or tiles. The polymerization period also depends on the type of finishing material. If you plan to lay linoleum, then it is better to use a polyurethane composition, because it can be used already 3 days after pouring. You may also be interested in how long the self-leveling floor dries if you lay it under the laminate. To do this, it is better to use gypsum, polymer or polyurethane compounds.

how long does the self-leveling floor eunice dry
how long does the self-leveling floor eunice dry

Cement mixtures are usually used under the tiles. Full curing can be expected within two weeks. The drying period depends on the quality of mixing the mixture and its uniform distribution. Otherwise, some areas may dry faster, while others will take about 12 hours more. Before pouring the floor, you should pay attention to the characteristics of the room. These should include:

  • base quality;
  • humidity;
  • temperature.

These factors affect the drying time of floors. The choice of mixture should depend on the type of finish. This should be taken into account when choosing self-leveling floors.

Overview of manufacturers

how long does the self-leveling floor under the tile dry
how long does the self-leveling floor under the tile dry

Before you make a choice in the direction of one or another self-leveling floor, you should pay attention to how much the self-leveling floor dries under the tile. An excellent example would be the products of several manufacturers. For example, Vetonit 3000, which is laid up to 5 mm thick, can be used for walking after 3 hours. You can apply the coating every other day at least. "Founding Mastline T-48", which can have a thickness of 3 to 80 mm, is used for further laying tiles or laminate. In the first case, the finishing coating can be applied after 3 days, in the second - after 7 days. Walking on such a surface will be possible after 4 hours.

how long does the self-leveling floor under linoleum dry
how long does the self-leveling floor under linoleum dry

Quite often, buyers ask sellers how long the Eunice self-leveling floor dries. If you have before you its variety of "Eco", which is based on gypsum, then it will be possible to lay tiles on such a surface in five days, and laminate or parquet - in 7 days. The material is poured with a thickness of 10 to 100 mm. And it will be possible to walk on such a coating within 4 hours after completion of work.

How long does the self-leveling floor "Prospectors" dry? This question may also interest you, because these products are quite popular among consumers. If you have a thin self-leveling floor in front of you, then it will be possible to lay the decorative coating in a couple of weeks, and walk in 8 hours. The thickness of the final layer of the rough surface can range from 1 to 20 mm.

When choosing a mixture, you must distinguish between two concepts - the curing period and the drying time. The second involves the possibility of foot loads, while the first - intensive continuous operation. Manufacturers let customers know when the floor in the finished screed can be walked on, and when to start finishing. In this regard, you may be interested in how long the self-leveling floor dries under the linoleum. If you have before you a universal mixture of Ivsil Tie-Rod-I, then the drying time for laying the said coating is 14 days. The same amount will be spent on drying the universal composition Weber Vetonit 4100.

Filling technology and reviews

how long does it take for screed to dry
how long does it take for screed to dry

In the process of pouring the self-levelling compound, it will be necessary to form an underlying layer. According to consumers, this allows you to reduce the filling cost by half. If you use a polymer floor, then its thickness should not exceed 5 mm. After the layer is poured onto the surface, air bubbles must be removed from its thickness. The most convenient way to use this, as home craftsmen emphasize, is a needle roller. Then you can start applying the front layer. distributethe composition at this stage can be done using doctor blades.

Recommended: