S alt rooms are otherwise called halochambers. Today, many people know about the usefulness of s alt procedures. Such preventive zones are often arranged in sanatoriums, in the offices of some companies where a he althy lifestyle is encouraged, as well as in respectable restaurants, as an additional service. Companies specializing in the arrangement of such premises will also offer their services to residents of the private sector, who most often do not know how to make a s alt room with their own hands.
There is only one major obstacle. This is the commercial cost of building this exclusive space. The price of services exceeds all forecasts and expectations. However, you can try to get out of the situation on your own. For this purpose, it is recommended to know a fewuseful tips on purchasing materials and arranging this room. This knowledge will help answer the question of how to make a s alt room with your own hands.
Requirements for the premises
The s alt room will require an enclosed space. Ideally, this should be an individual building, but any separate room will do. It must meet the following conditions, suggesting how to make a s alt room:
- As they say in the reviews, it is best to use the basement. Also, semi-basement apartments are in priority, and only in exceptional cases they choose a room on the first floor.
- The room must be dry. It must not contain water or sewer pipes or electrical wiring.
- The floor must have a concrete base. Wooden flooring will have to be removed, and, if necessary, a screed must be cast.
- The minimum height of such a room should be 2.4 meters, and ideally 3 meters.
If there is already a room that meets the specified requirements, then you can start purchasing material and organize preparatory work. In the event that a suitable separate room was not found, an individual building will have to be made.
Wall covering method
How to make a s alt room with your own hands? Reviews say that in total there are two ways to apply s alt to the wall. Firstly, it can be laid out in the form of s alt blocks. The latter, after installation, will form a monolithic structure.
Secondly, s alt can be applied to the walls in the form of plaster. At first glance, the second method looks more attractive, explaining how to make a s alt room at home cheaper.
However, it is worth considering that s alt is only sticky when wet. Reviews say that when it dries completely, it will certainly peel off and disappear at the first opportunity. Thus, instead of the desired preventive zone, a territory of endless repair work will turn out. For this reason, a more monumental option is proposed for consideration, providing a condition for how to make a s alt room with your own hands for long-term use.
Purchase of material
For the installation of s alt rooms, Himalayan s alt, which has a pink tint, is widely offered. However, in reality, this is only an aesthetic detail that allowed the creation of a promoted brand. Still, the market value of one unit reaches 700 rubles, and given that the proposed technology requires the purchase of a special compound for a bundle of blocks, the total cost can reach hundreds of thousands of rubles, which definitely will not provide favorable prerequisites.
But in fact, the s alt characteristics of the material of Himalayan origin are absolutely no different from all the others. For this reason, it is recommended to find a local manufacturer whose raw materials will have a significantly lower cost.
True, here you have to find your own approach, since such a manufacturer is set to sell wagonnorms. This means that several tons will be more difficult to acquire. The composition of the material must be chosen in different fractions, with a width of boulders from 0.5 to 0.15 meters, plus a small crumb of a fraction of 1-2 millimeters. This will help you make your own s alt room.
Preparatory stage
How to make a s alt room at home? The first step is to make sure that all materials from the previous interior decoration are removed from the walls. An exception can only be cement plaster, if it is in good condition. All windows must be blocked, the height of the doorway must be 2.2 meters. In any case, this condition must be observed. Otherwise, a s alt room built at home with your own hands will not be functional enough.
Insufficient wall thickness must be compensated for with reliable thermal insulation. If such a need exists, then you need to isolate the outer side of the walls, from the side of the street. Before you build a s alt room with your own hands, the floor covering must also be removed. If there is no concrete base, it needs to be made.
Ventilation
The s alt room must have a ventilation system. For this purpose, special channels are laid out of brick in the corners of the room. In this case, in no case should you use various pipes made of metal. S alt reacts very quickly with them, which will only create unnecessary problems.
Ventilation windowsit is necessary to arrange at a distance of one and a half meters from the floor level, and the exhaust holes in the wall are located as close as possible to the ceiling. This condition is important for maintaining the microclimate. It is impossible to create a room without forced ventilation.
Waterproofing
How to build a s alt room? During the waterproofing of walls, special building mixtures are used that have these characteristics. In stores specializing in the sale of this group of products, consultants can easily help you find the right composition. In modern construction, such products are in demand, so finding the right mixture is not difficult.
To apply the insulating compound to the wall, it must be diluted with water to a state of thick paint. Then, using a wide brush, apply successively to the wall. It is better to start from the top, gradually lowering to the floor. Thus, the thickness of the insulating layer applied in this way should be about two millimeters. With such a small consumption, a large amount of the mixture does not need to be purchased. Full hardening of the waterproofing layer will come in a week. After this work, you can continue.
Laying the floor
The next step is to start arranging the floor. For this purpose, it is necessary to select s alt clods no more than 15 centimeters wide. If during the purchase it is not possible to load a multi-fraction composition, then preference should be given to larger components. Subsequently, large pieces can be divided using a turbine and a chisel. To cut s alt, use concrete discs.
The process of laying s alt plates on the floor is similar to installing paving slabs. A layer of moistened s alt is laid on the floor. It should form in a lump when compressed, but at the same time not release water. S alt blanks are successively laid out on the litter, which are compacted with a rubber hammer. The latter for this purpose is best purchased with white rubber, since it does not leave marks. The resulting cavities are also covered with a s alt composition.
Walls
After the work with the floor is over, there is no need to maintain a technological pause. You can immediately transgress to the masonry walls. They need to be placed in a row. Start with the largest components that will make up the first row. Before laying the block in its place, a layer of wetted s alt is formed on the floor, forming a seat. Prepared s alt is also used to connect blocks to each other.
The next row is laid in the same way. On the seat of wet s alt, proportional blocks are placed one to one. It is important to consider here that each next row should be slightly smaller in width than the previous one. You need to calculate in such a way that there is a slope from the floor to the ceiling along the walls.
It is important to remember that every second row must be tied to the wall with wooden crutches. Moreover, it is necessary to fix not only horizontal seams, but also vertical ones. It is best to do this alternately, maintaining a distance of one meter. It is worth making sure that all the seams between the blocks are filled.moistened s alt. After a certain time, the wet material crystallizes, and the structure becomes monolithic.
Ceilings
In the process of laying walls under a slope, ventilation shafts will remain in the upper part. There is nothing wrong with that. They do not have to try to close up with s alt. For this purpose, sandstone can be well suited, which will only give the interior an aesthetic look. S alt plaster should also not be used on the ceiling. She still falls off. For the surface of the ceiling, it is recommended to use wooden lining, which will have to be fixed with copper nails.
Commissioning
At the last stage, it is necessary to install inlet and exhaust ventilation in the ventilation openings of the walls to artificially ventilate the room in order to maintain the necessary microclimate. A layer of s alt from three to five centimeters thick is poured on the floor and sunbeds are installed to your liking. It is important to remember that during the procedures, exhaust ventilation must be turned off. Full ventilation of the room should be carried out only in the absence of people.
During the finishing work, it is necessary to ensure that the room temperature remains between 26 and 28 degrees. These are the optimal conditions under which the s alt crystallizes. If this temperature regime is not established naturally, it is worth using a heater or other heating device.